Hospitality Radar

City overview · Africa

Hotel projects in Soma Bay, Egypt

Hospitality Radar follows 5 hotel projects in Soma Bay: 4 in planning, fewer than 3 in vision. The overview is free. Designers, contractors, contacts and sources are in the project files.

5in the pipeline
0in construction
0being specified now (general window)
0buying now (general window)

Few counted projects in Soma Bay so far (5). That is the state of our sources, not of the market there. More projects in Egypt.

5 projects in the city file for Soma Bay, all of them counted on this page. The city file lists them with operator, known roles, latest signals and the window per trade; it costs 40 credits (about 32 € in the entry plan Professional, 60 € without a plan; 4 per counted project, 40 to 150), as much as a single project file. With the city file, every project file in Soma Bay costs 20 instead of 40 credits. Designers, contractors, contacts and sources are in the project files; projects being specified or bought right now show their companies by name. A project file is about 20 to 60 € depending on the plan, about 32 € in the entry plan Professional, 60 € without a plan. All prices

Soma Bay
Photo: The original uploader was Dereenb at English Wikipedia., CC BY-SA 2.5, Wikimedia Commons

The projects in Soma Bay

5 projects with type, class, size range, opening date and when each trade is specified and bought.

PlanningOpening
PlanningOpening
PlanningOpening
PlanningOpening
VisionOpening
Sign in free to see all 5Free account with your company email. No card.

Specification and buying by trade

  • Facade & glazing3 specifying
    0 buying now
  • Spa, pool & leisure3 specifying
    0 buying now
  • Pre-opening & brandfewer than 3 specifying
    0 buying now
  • Furniture0 specifying
    0 buying now
  • Lighting0 specifying
    0 buying now
  • Bathrooms & sanitaryware0 specifying
    0 buying now
  • Textiles & curtains0 specifying
    0 buying now
  • Beds & mattresses0 specifying
    0 buying now
Show all 23 trades
  • OS&E & tableware0 specifying
    0 buying now
  • Flooring0 specifying
    0 buying now
  • Art0 specifying
    0 buying now
  • Interior fit-out0 specifying
    0 buying now
  • Doors & ironmongery0 specifying
    0 buying now
  • Electronic locks & access0 specifying
    0 buying now
  • Modular & bathroom pods0 specifying
    0 buying now
  • Elevators0 specifying
    0 buying now
  • Building services & energy0 specifying
    0 buying now
  • Switches & room controls0 specifying
    0 buying now
  • IT, TV & AV0 specifying
    0 buying now
  • Kitchens, bars & laundry0 specifying
    0 buying now
  • Outdoor & landscape0 specifying
    0 buying now
  • Fitness0 specifying
    0 buying now
  • Procurement & project management0 specifying
    0 buying now

Estimate from the opening date or the phase and the usual lead times per trade, as of November 2026; counts of 1 or 2 show as "fewer than 3".

A trade usually counts fewer projects than the general window at the top; these can count more, because their own window counts alone:

  • Specification: Facade & glazing, Spa, pool & leisure, Fitness, Pre-opening & brand
  • Buying: Bathrooms & sanitaryware, Doors & ironmongery, Facade & glazing, Modular & bathroom pods, Elevators, Fitness, Pre-opening & brand, Procurement & project management

Phase mix

Planning 4Vision fewer than 3

Openings by year

  • 20260
  • 2027fewer than 3
  • 20280
  • 20293
  • 2030fewer than 3
  • 2031 or later0

Counted projects by opening year, renovations not included. Counts of 1 or 2 show as "fewer than 3".

Open roles

  • 0 without a named operator
  • 5 without a named architect on the map
  • 5 without a named interior design studio on the map
  • 5 without a named general contractor on the map

Counted projects in vision or planning whose file names no company for this role yet. Most hotel projects name their general contractor late or never in public, so that figure shows what is not public yet, not open tenders. Counts of 1 or 2 show as "fewer than 3".

Who is active here

fewer than 3Operators on projects here

In total fewer than 3 companies on the 5 counted projects. Large figure: companies linked to the counted projects in Soma Bay. Small figure: companies with their office in Soma Bay, with or without a project here. Counts of 1 or 2 show as "fewer than 3". Names in the company files. No small figure: no company of this kind with its office in Soma Bay in our data. For 16 companies the data name only "Egypt" as their office, without a city, so they count for no city.

Nearby cities

All cities in Africa

The Radar Weekly

Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.

See the 5 projects in Soma Bay

Sign in with your company email to see every project with type, class, size range, opening date and where it stands for each trade. Open the files you need for names, teams and contacts.

5 projects in Soma BayStart free