Country overview
Hotel projects in Egypt
Hospitality Radar follows 94 hotel projects in Egypt, each with a published source, excluding renovations, pure residences and serviced apartments: 13 in vision, 54 in planning, 27 in construction. The overview is free. Names, teams and sources are in the files.
The project list is free with an account. A project file costs 40 credits, a city file 4 credits per counted project (40 to 150), plans start at 199 € a month with 250 credits. A project file is about 20 to 60 € depending on the plan, about 32 € in the entry plan Professional, 60 € without a plan. All prices
Specification and buying by trade
- Flooring31 specifying
11 buying now - Facade & glazing30 specifying
13 buying now - Switches & room controls29 specifying
11 buying now - Furniture29 specifying
8 buying now - Lighting29 specifying
8 buying now - Textiles & curtains29 specifying
8 buying now - Spa, pool & leisure29 specifying
8 buying now - Art28 specifying
11 buying now
Show all 23 trades
- Procurement & project management28 specifying
9 buying now - Interior fit-out27 specifying
11 buying now - Kitchens, bars & laundry27 specifying
11 buying now - Pre-opening & brand27 specifying
11 buying now - Fitness26 specifying
9 buying now - Doors & ironmongery25 specifying
12 buying now - Electronic locks & access25 specifying
8 buying now - Building services & energy25 specifying
8 buying now - IT, TV & AV25 specifying
8 buying now - Outdoor & landscape25 specifying
8 buying now - Bathrooms & sanitaryware22 specifying
7 buying now - Beds & mattresses22 specifying
7 buying now - OS&E & tableware22 specifying
7 buying now - Modular & bathroom pods20 specifying
18 buying now - Elevators20 specifying
9 buying now
Estimate from the opening date or the phase and the usual lead times per trade, as of November 2026; counts of 1 or 2 show as "fewer than 3".
A trade usually counts fewer projects than the general window at the top; these can count more, because their own window counts alone:
- Specification: Facade & glazing, Spa, pool & leisure, Fitness, Pre-opening & brand
- Buying: Bathrooms & sanitaryware, Doors & ironmongery, Facade & glazing, Modular & bathroom pods, Elevators, Fitness, Pre-opening & brand, Procurement & project management
Phase mix
Openings by year
Projects with a dated opening. Counts of 1 or 2 show as "fewer than 3". Projects without a public opening year (27) count by their phase. 2026 without a published month (12): 10 of them are in construction and may still open by year end; fewer than 3 are still in vision or planning, so their date will very likely move.
Open roles
- 5 without a named operator on the map
- 44 without a named architect on the map
- 51 without a named interior design studio on the map
- 65 without a named general contractor on the map
Counted projects in vision or planning whose file names no company for this role yet. Most hotel projects name their general contractor late or never in public, so that figure shows what is not public yet, not open tenders. Counts of 1 or 2 show as "fewer than 3".
Cities with a city page
30 of the 94 projects are in places with fewer than 5 projects and no city page of their own.
Companies on these projects
Companies linked to the counted projects, by role. Counts of 1 or 2 show as "fewer than 3". Names in the company files.
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the 94 projects in Egypt
Sign in with your company email to see every project with type, class, size range, opening date and where it stands for each trade.