Country overview
Hotel projects in the Turks and Caicos Islands
Hospitality Radar follows 11 hotel projects in the Turks and Caicos Islands, each with a published source, excluding renovations, pure residences and serviced apartments: 4 in planning, 7 in construction. The overview is free. Names, teams and sources are in the files.
The project list is free with an account. A project file costs 40 credits, a city file 4 credits per counted project (40 to 150), plans start at 199 € a month with 250 credits. A project file is about 20 to 60 € depending on the plan, about 32 € in the entry plan Professional, 60 € without a plan. All prices
Specification and buying by trade
- Flooring4 specifying
3 buying now - Art4 specifying
3 buying now - Switches & room controls4 specifying
3 buying now - Furniture4 specifying
fewer than 3 buying now - Lighting4 specifying
fewer than 3 buying now - Textiles & curtains4 specifying
fewer than 3 buying now - Fitness4 specifying
fewer than 3 buying now - Pre-opening & brand4 specifying
fewer than 3 buying now
Show all 23 trades
- Procurement & project management4 specifying
fewer than 3 buying now - Interior fit-out3 specifying
3 buying now - Doors & ironmongery3 specifying
3 buying now - Kitchens, bars & laundry3 specifying
3 buying now - Electronic locks & access3 specifying
fewer than 3 buying now - Building services & energy3 specifying
fewer than 3 buying now - IT, TV & AV3 specifying
fewer than 3 buying now - Outdoor & landscape3 specifying
fewer than 3 buying now - Modular & bathroom podsfewer than 3 specifying
4 buying now - Bathrooms & sanitarywarefewer than 3 specifying
fewer than 3 buying now - Beds & mattressesfewer than 3 specifying
fewer than 3 buying now - OS&E & tablewarefewer than 3 specifying
fewer than 3 buying now - Facade & glazingfewer than 3 specifying
fewer than 3 buying now - Elevatorsfewer than 3 specifying
fewer than 3 buying now - Spa, pool & leisurefewer than 3 specifying
fewer than 3 buying now
Estimate from the opening date or the phase and the usual lead times per trade, as of November 2026; counts of 1 or 2 show as "fewer than 3".
A trade usually counts fewer projects than the general window at the top; these can count more, because their own window counts alone:
- Specification: Facade & glazing, Spa, pool & leisure, Fitness, Pre-opening & brand
- Buying: Bathrooms & sanitaryware, Doors & ironmongery, Facade & glazing, Modular & bathroom pods, Elevators, Fitness, Pre-opening & brand, Procurement & project management
Phase mix
Openings by year
Projects with a dated opening. Counts of 1 or 2 show as "fewer than 3". Projects without a public opening year (fewer than 3) count by their phase.
Open roles
- 0 without a named operator
- 3 without a named architect on the map
- fewer than 3 without a named interior design studio
- 4 without a named general contractor on the map
Counted projects in vision or planning whose file names no company for this role yet. Most hotel projects name their general contractor late or never in public, so that figure shows what is not public yet, not open tenders. Counts of 1 or 2 show as "fewer than 3".
Cities with a city page
5 of the 11 projects are in places with fewer than 5 projects and no city page of their own.
Companies on these projects
Companies linked to the counted projects, by role. Counts of 1 or 2 show as "fewer than 3". Names in the company files.
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the 11 projects in the Turks and Caicos Islands
Sign in with your company email to see every project with type, class, size range, opening date and where it stands for each trade.