Country overview
Hotel projects in Australia
Hospitality Radar follows 148 hotel projects in Australia, each with a published source, excluding renovations, pure residences and serviced apartments: 5 in vision, 83 in planning, 60 in construction. The overview is free. Names, teams and sources are in the files.
The project list is free with an account. A project file costs 40 credits, a city file 4 credits per counted project (40 to 150), plans start at 199 € a month with 250 credits. A project file is about 20 to 60 € depending on the plan, about 32 € in the entry plan Professional, 60 € without a plan. All prices
Specification and buying by trade
- Flooring64 specifying
17 buying now - Switches & room controls62 specifying
17 buying now - Furniture62 specifying
12 buying now - Lighting62 specifying
12 buying now - Textiles & curtains62 specifying
12 buying now - Procurement & project management59 specifying
18 buying now - Art59 specifying
17 buying now - Pre-opening & brand58 specifying
24 buying now
Show all 23 trades
- Interior fit-out58 specifying
17 buying now - Kitchens, bars & laundry58 specifying
17 buying now - Electronic locks & access58 specifying
12 buying now - IT, TV & AV58 specifying
12 buying now - Outdoor & landscape58 specifying
12 buying now - Fitness56 specifying
16 buying now - Doors & ironmongery54 specifying
22 buying now - Building services & energy54 specifying
13 buying now - Beds & mattresses53 specifying
10 buying now - OS&E & tableware53 specifying
10 buying now - Spa, pool & leisure52 specifying
13 buying now - Facade & glazing51 specifying
18 buying now - Bathrooms & sanitaryware50 specifying
10 buying now - Modular & bathroom pods48 specifying
29 buying now - Elevators48 specifying
13 buying now
Estimate from the opening date or the phase and the usual lead times per trade, as of November 2026; counts of 1 or 2 show as "fewer than 3".
A trade usually counts fewer projects than the general window at the top; these can count more, because their own window counts alone:
- Specification: Facade & glazing, Spa, pool & leisure, Fitness, Pre-opening & brand
- Buying: Bathrooms & sanitaryware, Doors & ironmongery, Facade & glazing, Modular & bathroom pods, Elevators, Fitness, Pre-opening & brand, Procurement & project management
Phase mix
Openings by year
Projects with a dated opening. Counts of 1 or 2 show as "fewer than 3". Projects without a public opening year (51) count by their phase. 2026 without a published month (27): 20 of them are in construction and may still open by year end; 7 are still in vision or planning, so their date will very likely move.
Open roles
- 36 without a named operator on the map
- 20 without a named architect on the map
- 65 without a named interior design studio on the map
- 85 without a named general contractor on the map
Counted projects in vision or planning whose file names no company for this role yet. Most hotel projects name their general contractor late or never in public, so that figure shows what is not public yet, not open tenders. Counts of 1 or 2 show as "fewer than 3".
Cities with a city page
66 of the 148 projects are in places with fewer than 5 projects and no city page of their own.
Companies on these projects
Companies linked to the counted projects, by role. Counts of 1 or 2 show as "fewer than 3". Names in the company files.
The Radar Weekly
Every Monday: new signals, a city and a trade in numbers. Free, one click to leave.
See the 148 projects in Australia
Sign in with your company email to see every project with type, class, size range, opening date and where it stands for each trade.