Hospitality Radar

Who it is for›Manufacturers and suppliers

Manufacturers and suppliers

1,524 hotel projects in the specification window

Whoever is specified has the better chances in the tender. The radar shows both windows for your trade, and who designs, builds and runs each project.

Phase and buying window
Sample file, invented project
1,524in the general specification window, 24 to 12 months before opening
804in the general buying window, 15 to 6 months before opening

Recounted every morning from the live radar, only projects with a source, no pure residences. Last count 12 November 2026.

Plan and profile

Plan for this role
Supplierfrom 199 € / month

Professional 199 € · Team 499 € · Enterprise 1,490 €, per month

Supplier plans: Professional, Team and Enterprise, with credits for the files. A project file is 40 credits: about 20 to 32 € in a plan, about 32 € in the entry plan Professional, 60 € without a plan. A file names the companies with role and source and their published contact route. Named contacts on the project are not in the file. We research them on request: write to [email protected] naming the file, and we reply with an individual quote, binding only once you accept it (Terms 4.6).

Who to talk to now, in this phase
Sample file, invented project

In the file

  • Early into the specification

    For 23 trades: when the studio chooses and when orders are placed.

  • Who specifies

    Studio, architect, developer and operator per project.

  • Your references, verified

    Studios and buyers see what you delivered and where.

What a file shows

Example, no names
Lifestyle hotel, 4★Western Europe · construction · opening 2027
  • Interior design studionamed in the file
  • Architectnamed in the file
  • Brand and operatornamed in the file
  • Procurementnot named in any source
4 sourceslast checked Oct 2026

Evidence

Every fact with its source

The sample file shows a complete project file with an invented project. Real files link every source to the original page and keep the date it was read.

What we count

These two figures use the general window of all trades. Each trade has its own window on its trade page, where a project counts when it is in the trade's window and in the general window. The windows are estimates from the planned opening. A project can sit in both windows at once. Projects without a public opening year count by their phase, as an estimate.

Sources of the file, each with its date
Sample file, invented project

Is this your company?

Suppliers confirm the hotels they delivered in a free supplier profile. Studios and buyers see it in the files. Whoever searches pays. Whoever wants to be found gets a free, verified profile.

Supplier from 199 € / monthStart Supplier